Turnkey- Engineering Services

Reverse Engineering

Work Require

  • Reverse Engineering of Machine components
  • 3D modeling of components
  • 2D manufacturing drawing

  • Timeline

  • 1 year annual contract

  • Software Used

  • Creo
  • Auto-Cad




  • 2D to 3D Lantern Model Development

    Work Require

  • Reverse Engineering of Machine components
  • Optimizing Design
  • 3D modeling of components
  • 2D manufacturing drawing

  • Timeline

  • 7 Days

  • Software Used

  • Creo


  • 3D Model & 2D Manufacturing drawing development

    Work Require

  • Reverse Engineering of Machine components using 3D scanning
  • Optimizing Design
  • 3D modeling of components
  • 2D manufacturing drawing

  • Timeline

  • 1 month

  • Software Used

  • Creo




  • Development of Dredge Pump Assembly

    Work Require

  • Reverse Engineering of Pump parts using 3D scanning
  • Optimizing Design
  • 3D modeling of components
  • 2D manufacturing drawing

  • Timeline

  • 6 month

  • Software Used

  • Creo




  • 3D Model development from Scanning

    Work Require

  • Scanning of existing components
  • Optimizing Design
  • 3D modeling of components
  • 2D manufacturing drawing

  • Timeline

  • 1 month

  • Software Used

  • Creo
  • Geo-magic




  • Cost Optimization

    Work Require

  • Redesign link
  • Reducing manufacturing cost by 10%
  • Check feasibility to convert fabricated design to casting
  • Maintaining same kinematic points

  • Timeline

  • 1 month

  • Software Used

  • Creo
  • Ansys




  • Pipe Stress Analysis

    Work Require

  • Stress analysis of Steam line (Turbine outlet to heater)
  • Size 300DN
  • Temp, 550oC
  • Check support location
  • Type of support require for the system

  • Timeline

  • 10 Days



  • Pipe Stress Analysis

    Work Require

  • Stress analysis of cooling water Header GRP pipe
  • Size 120DN & 1500DN
  • Check support location
  • Type of support require for the system

  • Timeline

  • 10 Days

  • Software Used

  • Ceasar



  • Design, Validation and Optimization

    Work Require

  • Design Baseplate for pump package
  • Shaft deflection should be within limit as per pump manufacturing standard
  • Verify and Optimize design using FEA

  • Timeline

  • 15 Days

  • Software Used

  • Creo
  • Creo simulation



  • Design and Validation

    Work Require

  • Design skid for pump/compressor package
  • 3D modeling of components
  • 2D manufacturing drawing

  • Timeline

  • 1 Month

  • Software Used

  • Creo
  • Auto-Cad



  • Design, Manufacturing & Assembly

    Work Require

  • Design skid for pump/compressor package
  • 3D modeling of components
  • 2D manufacturing drawing

  • Timeline

  • 1 Month

  • Software Used

  • Creo
  • Auto-Cad



  • Download Our Company Profile (zip)

    About Our Company

    B E Asia Pvt Ltd established in 2011, has built its reputation on the cornerstones of high quality products, customer satisfaction & superior services. We marked our presence all across the globe by catering to its clientele in various countries and applications including Chemical, Petrochemical, Fertilizers, Refineries, Pharmaceutical, Food & Beverages, Biotech, Oil & Gas, Paper, Steel, Cosmetics & Textile industries.